Plunger III SSN-595

 

Plunger III

(SSN-595: dp. 3,700 (surf.), 4,300 (subm.); 1. 278'6"; b. 31'8"; B. 20+ k.; cpl. 100; a. 4 tt.; cl. Thresher)

The third Plunger (SSN-595) was authorized as an SSGN but was laid down as an SSN 2 March 1960 at Mare Island Shipyard, Vallejo, Calif.; launched 9 December 1961; sponsored by Mrs. Clinton P. Anderson; and commissioned at Mare Island 21 November 1962, Comdr. William M. Adams in command.

Following a trip to Puget Sound 27 November to test torpedo tubes and sound gear, Plunger departed Mare Island 5 January 1963 for ehakedown to Pearl Harbor. Plunger next was homeported at Mare Island and operated to test the performance of sonar and the fire control system. In April she changed homeport to Pearl Harbor, where she became flagship of ComSubDiv 71, 1 April.

Continuing in a testing capacity, Plunger evaluated the most advanced class of nuclear attack subs. Operating off the U.S. west coast during the spring and summer, she proceeded to Wake Island 15 September 1964 for SubRon Operational Evaluation missile firing.

At Pearl Harbor again in January 1965, Plunger waB Be leeted to demonetrate the capability of the Navy's latest ASW weapon eystem to Dr. Donald Hornig, Speeial Assistant to the President for Seienee and Teehnology. At Wake Island in May, Plunger participated in C/S-17, the SubRon Qperational Training Test. In September she prepared for WestPac deployment, which continued into mid 1966. During this deployment, Plunger conducted evaluation exercises of AN/SQS-36 sonar and traveled as far east as Okinawa and Subic Bay. She also conducted ASW exercises and executed oceanographic and port surveys.

At Pearl Harbor with SubRon 7 in 1967, Plunger operated to improve the ASW readiness of the Pacific fleet; from 6 to 22 March, She participated in ASW exercises and later continued in advanced type-training work. During inport periods at Pearl Harbor Plunger provided services to Fleet Training Program Pearl Harbor. Homeporting at Puget Sound the last 6 months of 1967, Plunger returned to Pearl Harbor 1 February 1968 .

 

USS Plunger underwent a refit in Bremerton from 1980-1982 receiving several modernizations including the BQQ-5 Sonar System. She returned to San Diego after sea trials in 1983. She deployed to Westpac from January - June 1984 participating in two long operations during the deployment. She was involved in a collision with a freighter off Southern California while coming to periscope depth in early 1985 which damaged portions of her bow and sonar dome. These repairs required an unscheduled drydock during the spring of 1985.

In 1986 Plunger won the Marjorie Sterrett Battleship Fund Award, becoming the first warship to win both the Sterrett and the Arleigh Burke Awards. In this year, too, Plunger made yet another deployment to the Western Pacific, making port calls in Yokosuka, Japan and Subic Bay in the Philippines as well as visiting Hong Kong as a liberty port. During the 1986 WestPac Plunger participated in naval exercises with ships from the US, Japan, and other nations as well as a ten-week "special operation", for which it was awarded the Meritorious Unit Commendation. After returning from the WestPac Plunger conducted normal operations in the SoCal Operational Area for the next several months.

The next few years saw a number of other accomplishments - Plunger was recognized for excellence in virtually every major inspection and won the Battle Efficiency (the coveted "Battle E") award for overall combat readiness. Although aging, Plunger maintained a grueling operational schedule, spending over 60% of her time at sea and never missing a scheduled underway period - a record that many much newer submarines were unable to match.

Plunger made her final WestPac deployment in 1988, visiting Japan and the Philippines as well as Guam and Chinhae, South Korea (and making port calls in Okinawa and Hong Kong) and conducting another two-month "special operation" that garnered her a Navy Unit Commendation. This WestPac was followed by another fairly intense period of routine operations out of San Diego and, in December 1988, departure for her final "special operation" - this time keeping her crew at sea over Christmas, New Year's Day, and (to the disappointment of the crew) Super Bowl Sunday. This special operation ended with Plunger completing its final Operational Reactor Safeguards Examination (which it passed with flying colors) and giving its crew some well-earned R&R in Pearl Harbor Hawaii.

Returning to home port, Plunger was deactivated (while under the command of William Large), in commission, on 10 February 1989, decommissioned on 3 January 1990 and stricken from the Navy Register the following 2 February. Ex-Plunger entered the Nuclear Powered Ship and Submarine Recycling Program in Bremerton, Washington, on 5 January 1995 and on 8 March 1996 ceased to exist.

At the time of decommissioning Plunger was noted by the San Diego Tribune as being the most-decorated submarine in the Pacific Fleet and it was the most-decorated warship in San Diego. Through its history, Plunger was awarded four Navy Unit Commendations as well as multiple Meritorious Unit Commendations, Battle Efficiency, and other awards. And as of its retirement Plunger was the only submarine to win the Arleigh Burke Award (in 1969 under Commanding Officer Nils Thunman).a