James K. Polk SSB(N)-645

 

 

SSBN602

James K. Polk

(SSB(N)-645; dp. 7,250 "surf.); 8,250 (subm.); 1. 425'; b.
33'; dr. 31'5"; s. over 20 k.; cpl. 140; a. 16 Poll mist;
cl. Lafagette)

The keel for the Navy’s 35th Fleet Ballistic Missile submarine and the first ship of the fleet to be named in honor of James K. Polk was laid at General Dynamics Corporation’s Electric Boat Division at Groton, CT, on November 23, 1963. A year and a half later, this submarine began her water borne career after being christened USS JAMES K. POLK (SSBN-645) by Mrs. Horation Rivero, Jr. on May 22, 1965. For the next 10 months, she underwent fitting-out and on March 13, 1966, she conducted her first sea trials. USS JAMES K. POLK was commissioned as a ship of the U.S. Navy on April 16, 1966.USS JAMES K. POLK combined the almost unlimited endurance of nuclear power with the deterrent might of 16 thermonuclear missiles capable of wreaking more havoc than all the bombs of World War II. These missiles had a range of 2500 nautical miles and were housed in 16 launching tubes located aft of the sail.
USS JAMES K. POLK sailed to Charleston, SC in September 1966 to load-out Polaris missiles for her initial deterrent patrol. After completion of the shakedown period, she operated in the Atlantic Ocean and completed 19 strategic deterrent patrols from September 1966 until May 1971.

USS JAMES K. POLK conducted her first overhaul at Newport News Shipbuilding and Drydock Company in Virginia for nuclear refueling and conversion of the weapons system to the Poseidon missile system in July 1971. She completed her conversion in late 1972 and commenced a rigorous schedule of sea trials and exercises. These events culminated in the Demonstration and Shakedown Operation (DASO) of the Poseidon missile system. The DASO afforded the opportunity to test the ship’s system, train the crew and launch a Poseidon C-3 missile from the submarine.

USS JAMES K. POLK commenced Poseidon deterrent patrols in the Atlantic Ocean in May 1973. She conducted her second overhaul at Portsmouth Naval Shipyard after completing her 50th deterrent patrol in September 1981. The ship completed overhaul in 1983 and conducted 7 more successful patrols.

USS JAMES K. POLK returned to Portsmouth Naval Shipyard in January 1986 for a third overhaul after completing her 58th deterrent patrol. She departed Portsmouth Naval Shipyard in November 1988 and sailed south for commencement of her Demonstration and Shakedown Operations (DASO). May 1989 marked the beginning of her final series of Poseidon strategic deterrent patrols.

USS JAMES K. POLK celebrated her 25th year of commissioned service in April 1991 and completed her 66th and final strategic deterrent patrol in August of that year. She completed a nineteen month shipyard conversion which removed her 16 Poseidon missiles in March 1994 and converted her designation from SSBN-645 to SSN-645. Since conversion, she has completed two extended deployments to the Mediterranean with Dry Deck shelters and has participated in numerous SPECWAR and NATO exercises.