< Zebra AKN-6

Zebra AKN-6

 

Zebra

(AKN-6: dp. 14,350 (tl.), 1. 441'6", b. 56'11", dr. 28'4"; s. 12.5 k. (tl.); cpl. 228; a. 1 6", 4 40mm.; cl. Indus; T. EC2-S-C1)

SS Matthew Lyon"Liberty" ship built by the Permanent Metals Corp. at Richmond, Calif.—was laid down on 18 March 1943 under a Maritime Commission contract (MCE hull 535); launched on ll April 1943 sponsored by Mrs. Harry H. Feldhahn, and delivered to the War Shipping Administration (WSA) on 26 April 1943. Operated for the WSA by a civilian contractor, Dichmann W. & P., the ship plied the waters of the Pacific during the summer of 1943. On 12 August, while voyaging to Espiritu Santo in the New Hebrides, she received severe damage as the result of a torpedo fired by the Japanese submarine 1-11. Several days later, the freighter limped into Espiritu Santo and languished there in Segond Channel for several weeks, apparently headed for scrapping.

Late in September, a naval officer recognized her potential for emergency service as a net cargo ship; and, on 1 October 1943, she was placed in service as Zebra (IX-107). Her subsequent success in that role prompted her complete conversion to a net cargo ship and her total rehabilitation to operable status. On 15 February 1944, the ship was redesignated AKN-5, and Zebra was placed in commission on 27 February 1944, while in drydock at Espiritu Santo, Lt. Comdr. Robert D. Abernethy, USNR, in command.

During the first three months of her commissioned service, Zebra remained at Espiritu Santo completing her partial conversion to a net cargo ship. She began her first mission on 1 June, when she started loading a cargo of reclaimed net material and put to sea on the 8th, bound for New Caledonia. The ship arrived in Noumea on the 11th, unloaded her net material, and took on a general cargo destined for the Fiji Islands. She departed Noumea on 19 June, arrived at Suva three days later, unloaded and began taking on reclaimed net material. On the 25th, she moved to the other side of the island where she began loading material salvaged from the Nandi net installations. The ship completed loading on 5 July and headed back to New Caledonia that same day. Zebra entered Noumea on 8 July and discharged her load of salvaged net gear. Following 10 days at Noumea, the net cargo ship embarked upon a circuit of various South Pacific islands to collect nets and equipment salvaged from the harbor defense installations. Through the remainder of the summer, the ship visited Tongatabu, Bora Bora, Tutuila and Upolu Samoa; and Funafuti. At each island, she stopped long enough to unload part of the general cargo she had taken on at Noumea and pick up each installation's salvaged net gear. She departed her last port of call on that voyage, Funafuti in the Ellice Islands, on 23 August and returned to Noumea five days later.

Zebra remained at Noumea until 15 September. On that day, she embarked upon a voyage which took her closer to war and which brought her first actual net laying mission. The ship arrived in Eniwetok lagoon on 24 September and remained there until 3 October when she continued on toward the Western Carolines. Reaching Ulithi Atoll on 8 October, the net cargo ship immediately began installing net gear around the anchorage with two of her sister ships, Sagittarius (AKN-2) and Tuscana (AKN-3). They completed their mission by 10 November, end Zahra loaded the unused net material for transportation to the Palaus She departed Ulithi that same day and entered Barnum Bay near Peleliu two days later. While the fighting on Peleliu continued, the net cargo ship assembled a net installation for the protection of a wharf about to be constructed at the island. She concluded that portion of her mission on 14 November and headed north in company with two net tenders to the anchorage at Kossol Roads. There, she spent 11 days assembling over two miles of net and supporting equipment. At the conclusion of that assignment, Zebra received orders to Pearl Harbor. She departed the Palaus on 25 November, stopped at Eniwetok briefly on 4 December, and arrived in Hawaii on the 15th. At Pearl Harbor, she underwent 20 days of repairs and modifications before loading net gear in preparation for her next mission.

She remained at Pearl Harbor through the end of January 1945 awaiting sailing orders. Finally, the ship got underway on 5 February, bound for Iwo Jima. She stopped at Eniwetok between 16 and 21 February and then continued her voyage. Two days out of Eniwetok, Zebra's convoy received orders changing its destination from Iwo Jima to Saipan in the Marianas. Zebra, two net tenders, and a destroyer, however, received instructions to continue on to their original destination as a result of battle damage to her sister ship Keokuk (AKN-4). The little task unit arrived off Iwo Jima on 28 February, and Zebra immediately began double duty laying nets and serving as flagship for all minecraft in the vicinity. She stayed at Iwo Jima for 42 days, laying nets in spite of adverse weather, heavy seas, and fire from the doomed but stubborn enemy garrison. She also superintended the laying of ship moorings and performed several salvage jobs including pulling Zuni (ATF-96) and LST-727 off the Iwo Jima beach.

Zebra concluded her tour of duty at Iwo Jima on 11 April and shaped a course back to Eniwetok, where she arrived on the 18th. Continuing east, the ship entered Pearl Harbor again on 28 April for a four-day layover before resuming her voyage to the west coast. On 11 May, the net cargo ship arrived in San Francisco, Calif., to complete her conversion to a net cargo ship. She entered the Oakland yard of the Moore Drydock Co. on 14 May. Work continued until mid-July when she received orders to participate in net laying experiments at Tiburon, Calif. Though speeded up, her conversion had not been completed when she slipped her moorings on 25 July to join the operations up the bay at Tiburon. That duty lasted until 3 August at which time the ship returned to Moore Drydock Co. to complete the remaining conversion work. On 26 August, she made her post-conversion, full power trial run and, soon thereafter, received orders assigning her to the Administrative Command, Minecraft, located at Pearl Harbor.

The ship stood out of San Francisco Bay on 31 August and arrived in Pearl Harbor on 8 September. She remained in Hawaii only 12 days. On 20 September, she headed back to the western Pacific to collect salvaged net equipment. Carrying a small cargo of mine gear for the Marshall Islands command, she steamed to Kwajalein where she arrived on 30 September and unloaded her cargo before proceeding on to Iwo Jima. Zebra arrived at the latter island on 9 October, loaded net gear, and then headed for the Marianas on the 29th. The ship made port at Saipan on 1 November, unloaded the salvaged net equipment at the Saipan stockpile, and began loading passengers and equipment for return to the United States.

She departed Saipan on 15 November and stopped at Guam on the 16th. There, she unloaded some minesweeping gear before resuming the voyage on the 29th. Steaming by way of Pearl Harbor Zebra arrived in the Canal Zone on the last day of 1945. Routed on to Norfolk, VA., she reported to the Commandant, 5th Naval District, on 8 January 1946. Zebra was decommissioned at Norfolk on 21 January 1946 and simultaneously returned to the War Shipping Administration. Her name was struck from the Navy list on 7 February 1946.

Zebra was awarded one battle star for service during World War II.